Home | Links | Contact Us | Post a job | Bookmark
Search jobs:
Home Energy and Utilities Engineering-Project-Scheduler


 Refinery Reliability Engineer
Leading integrated energy company is seeking to fill the position of Refinery Reliability E...


 Instrumentation Instructor - Gas Measurement and Control
Our energy flows through you!  At Pacific Gas and Electric Company, we recognize that our ...


 Human Resource Director
The Synergy Companies, with corporate headquarters in Hayward, California and branch offices in F...


 Marketing Research Analyst in an exciting pre IPO company
Energy Recovery, Inc. (ERI®) is a privately-held, California-based company that has developed and ...


 Receptionist/ Jr. Admin
Company Nelson Staffing Solutions L...


 Terminal Manager
Description:The Terminal Manager directs the day-to-day activities of the Terminal as they pertain ...


 Toxicologist / 03227081
Position Description:Chevron Corporation is one of the world’s leading energy companies. H...


 Human Resources Director / 03017919
Position Description:Job Title: HR Director Location: California, Texas Chevron is looking ...


 Product Development Engineer-Lubricant Base Oils / 31978059
Position Description:Company Information:Chevron Corporation is one of the world’s leading energy ...


 Reactor Design Engineer / 31978449
Position Description:Chevron Corporation is one of the world’s leading energy companies. H...


 Engineering Project Scheduler

Details
Country: USA
Location: California-Los Angeles Pasadena, CA 91103
Total applied: 21
Salary/Wage:DOE
Job Category:Project/Program Management
Relevant Work Experience:5+ to 7 Years
Education Level:Bachelor's Degree
Location:Pasadena, CA 91103
Status:Full Time, Employee
Occupations:IT Project Management;General/Other: Project/Program Management;Project Management
Career Level:Experienced (Non-Manager)
Relevant Work Experience:5+ to 7 Years
Engineering Project Scheduler

Engineering Project Scheduler

Position title

Engineering Project Scheduler

Company

eSolar

Location

CA - Los Angeles

Company Description

eSolar develops large utility-scale solar power plants to cleanly and cost-effectively generate electricity on a massive scale. eSolar is an Idealab company and located in Pasadena.

Position Purpose

The Engineering Project Scheduler is responsible for the development and control of master schedules including balancing the workload with the available resources with the emphasis on schedule consistency and workability

Accountabilities

•Responsible for management tracking and implementation of multiple Microsoft project schedules from various sources which may require resource loading and tracking

•Responsible for developing and maintaining multiple integrated engineering master schedules and report generation among various departments

•Plan, schedule, estimate cost control, commitment tracking, risk analysis and project/management reporting for engineering projects

•Formulate and recommend corrective actions

•Coordinate, develop and update master schedules to ensure product production goals are met through effective planning, resource allocation, parts acquisition and schedule execution

•Develop detailed, accurate and usable schedules and reports to provide effective management tools for execution and feedback

•Attend scheduling meetings to ensure pre-planning, implementation, schedule critiques are effective in developing continuous product improvement

•Responsible for providing general staff support by analyzing, maintaining and tracking program action items

Requirements/Qualities

•Must be proficient with MS Project as well as the standard MS Office suite (Word, Excel, Access, and PowerPoint).

•5+ years experience as a scheduler; must be competent building resource loaded project schedules and maintaining an integrated master schedule

•Must be analytical, proactive, comfortable interfacing with all levels of the organization, detailed, organized, able to function in a fast paced environment and possess good communications skills

•Possess strong analytical skills to discover weaknesses within current business processes and documentation

•Attention to detail is a critical factor to succeed in this position

•Broad knowledge of Project Controls Scheduling systems and processes including computer based applications

•Bachelor's Degree in engineering, construction management, or business (or higher)

INTERESTED CANDIDATES SHOULD SUBMIT THEIR RESUMES TO: HIRING@ESOLAR.COM

  eSolar is an equal opportunity employer

 

 

- Apply for Engineering Project Scheduler

Your email:
Friend email:

Related jobs
  IT Adminsitrator
Title: IT Administrator Reports to: Vice President of Software Development The Company: eSolar develops utility-scale solar power plants to cleanly and cost-...
  Software Test Automation Engineer
The Company: eSolar develops large utility-scale solar power plants to cleanly and cost-effectively generate electricity on a massive scale.  eSolar is an I...
  Energy Engineer
Job Summary Under of the Director of Engineering, the Energy Engineer will conduct facility energy audits, identify opportunities for energy savings and capital invethe ...
  Reliability Technician
Soliant Energy is a venture backed company whose mission is to dramatically reduce the cost of solar power. Our next-generation solar panels will deliver triple the ...
  Senior Electrical Engineer/SwitchGear Engineer/Power Engineer/Test Engineer
ABOUT CROWN     Crown Technical Systems located in Pomona, CA is a leading manufacturer of Protective Relaying Control Panels and integrated Control B...
  Service Route Manager A/C Filter Change-Out
MUST APPLY AT WWW.FILTERPRO.COM   JOB CODE:  JOBS0001   Competitive hourly wages paid weekly + overtime and benefits.  No Sunday work; Most S...
  Senior Project Services Coordinator
MAIN PURPOSE OF ROLE: This position is the Client Project Controls representative in the Arcadia, California office providing day-to-day oversight of contractors ...
  Maintenance, Water Agency Maintenance Worker II
Maintenance WATER AGENCY MAINTENANCE WORKER II $21.78 - $26.47/hour Maint, repair & installation of water & wastewater treatment, storage and distribution systems. ...
  Director of Sales and Market Development for Solar Manufacturing Company
Director of Sales and Market Development for Solar Manufacturing Company.   ET Solar is a global photovoltaic  manufacturing company. We produce solar ...
  Stock Administration Specialist
Location 1414 Harbour Way South, CA 94804 Job Category Human Resources ...

0.004

Archive: All jobs - Links - Links1 - Links2

Copyright (c)2007 HT06.org - All rights reserved